1: First fix the skeleton, and then position the skeleton on the ballistic base, fix the skeleton on the main structure, remember to check the quality of the main structure before pay-off.
2. Weld the connector on the column of the main structure to fix the skeleton, so that the skeleton will not fall.
Three: Before installation, the skeleton should be treated with anti-corrosion. The position of the mounting skeleton should be accurate and the bond should be firm. After installation, check the centerline, surface elevation, etc. In addition, for the installation accuracy of the plate, it is recommended to use a theodolite to penetrate the beam mullion members. The deformation joints, settlement joints, variable cross-sections, etc. should be perfected to meet the requirements of use.
Four: When installing the aluminum plate, the installation should be firm, simple and easy.
1. The gap between the plates should be treated to make them smooth and smooth.
2. After the installation of the aluminum plate, cover it with plastic film or other materials to protect the parts that are easy to be polluted.
Precautions for aluminum veneer installation
1. When transporting, it should be handled gently, and the corners of the aluminum plate and its layout will be damaged after the violent collision, which will affect the construction and waste money.
2. During the installation process, you should also pay attention to protect the board surface, and do not touch the ground with the board surface, so as not to scratch the decorative surface.
3. The variety, quality, color, pattern and line of aluminum plate should meet the design requirements, and there should be a product certificate.
4. If the curtain wall skeleton adopts steel keel, its specifications and shapes should meet the design requirements, and should be treated with rust removal and rust prevention
5. Aluminum plate installation, when the design is not required, it is recommended to use core-pulling aluminum rivets, and there must be a rubber ring in the middle. The spacing of blind rivets should be controlled within 100-15omm.
6. After the installation is completed, pay attention to tear off the protective film after 3 days, it will be difficult to tear off after too long, and it will affect the appearance after tearing off.