1. Under normal circumstances, the membrane structure landscape sub-division project can be accepted according to the production sub-project and the installation sub-project, but in the actual process, it can also be divided into the membrane structure landscape installation sub-project, and the membrane unit products can be directly inspected according to the radiation of the material/structural parts, and the quantity list, quality confirmation, process control, self-inspection effect and other documents need to be provided.
2. The application of pretension in the landscape engineering of membrane structure is a key link, and its application process and numerical record should be included in the quality management inspection record of the construction site.
3. Size deviations may occur in the production and installation process of membrane structure landscape, steel structure, cable, etc., and there may be local wrinkles on the membrane surface.
4. For the inspection of the tensile value of the membrane surface, there is no instrument that can correctly measure the tension of the membrane surface in China, and this provision does not require mandatory implementation, but requires process control and empirical judgment.
5. The difference between the air-supported membrane structure landscape and the conventional membrane structure landscape is that it must be restarted before it can be used, so the inflatable system must be tested before acceptance.